Asphalting works at proposed areas in the new Security Squadron facilities project at RGO HQ Complex for Royal Guard of Oman

The scope of work included scarification & compaction of existing soil to prepare the subgrade level, GSB type B 150mm thick, ABC type A 150mm thick, Asphalt surface course with prime coat 65mm thick, construction of concrete drain 150mm thick including excavation, concreting with backfilling, supply & fixing of kerb stone, interlocking tiles with 50mm compacted soil.